{"id":15192,"date":"2026-09-29T12:13:10","date_gmt":"2026-09-29T12:13:10","guid":{"rendered":"https:\/\/www.sparxitsolutions.com\/blog\/?p=15192"},"modified":"2026-09-29T12:15:28","modified_gmt":"2026-09-29T12:15:28","slug":"legacy-systems-in-healthcare","status":"publish","type":"post","link":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/","title":{"rendered":"Legacy Systems in Healthcare: The Real Cost and How to Modernize"},"content":{"rendered":"<p>A legacy system in healthcare is any clinical or administrative application your organization still depends on but can no longer patch, integrate or support properly. It has lost vendor support, cannot exchange data through modern standards, or runs on an operating system that no longer receives security updates.<\/p>\n<p>The people using those systems describe the effect plainly. In a 2025 survey of more than 1,000 frontline healthcare professionals across the US, UK and Ireland, conducted by Censuswide for Presidio, <a href=\"https:\/\/www.hipaajournal.com\/healthcare-outdated-technology-patient-safety-cybersecurity\/\" rel=\"nofollow\">98% said outdated or inefficient technology causes delays or errors in patient care<\/a>. Close to 90% said their current systems fail to meet their needs.<\/p>\n<p>This guide covers what counts as a legacy system and what it does not, how much these systems cost to keep running, the regulations that now set the timetable, how to decide between maintaining and modernizing, the six modernization approaches and when each one fits, what modernization costs, the challenges that derail these programs, how to build the ROI case, and what happens to patient data when the old system is finally switched off.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_is_a_Legacy_System_in_Healthcare\"><\/span>What is a Legacy System in Healthcare?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A legacy system in healthcare is a clinical, financial or administrative application that still performs a needed function but can no longer be updated, secured or integrated at acceptable cost. Age alone does not make a system legacy. Loss of vendor support, absence of standards-based interfaces, and dependence on a shrinking pool of engineers do.<\/p>\n<p>That distinction matters when you build a business case. A twelve-year-old radiology information system with an active support contract, a documented HL7 v2 interface and three engineers who know it is not a modernization priority. A five-year-old departmental database written by a clinician who has since retired, with no documentation and a hardcoded database password, is.<\/p>\n<p>In provider environments, the systems most often classified as legacy are aging EHR and EMR platforms, laboratory and radiology information systems, and PACS image archives. Revenue cycle and claims applications, pharmacy systems and embedded medical device software follow close behind. So do the point-to-point interfaces holding all of it together.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"How_Common_are_Legacy_Systems_in_Healthcare\"><\/span>How Common are Legacy Systems in Healthcare?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Nobody publishes a clean national count, and several of the figures circulating in this space are older than they look.<\/p>\n<p>The most current evidence comes from the workforce. The Presidio survey cited above, run by Censuswide across more than 1,000 frontline healthcare professionals and published in November 2025, found that 89% of respondents encounter technology-driven care issues regularly, with 24% hitting one at least once per shift. Around a quarter said they use workarounds to complete basic tasks. Only 35% reported their organization uses real-time data at scale to support clinical decisions.<\/p>\n<p>Federal data shows how long these systems survive once embedded. In <a href=\"https:\/\/www.gao.gov\/products\/gao-25-107795\" rel=\"nofollow\">GAO-25-107795<\/a>, published 17 July 2025, the U.S. Government Accountability Office reviewed the 11 federal legacy systems most in need of modernization across 10 agencies. They ranged from roughly 23 to 60 years old and cost about $754 million a year to operate and maintain between them.<\/p>\n<p>One of those 11 was a Department of Health and Human Services system supporting clinical and patient administrative activities. It was 55 years old, and GAO reported cybersecurity weaknesses that could only be resolved by modernizing it. Eight of the 11 systems had no complete modernization plan.<\/p>\n<p>The same report notes that agencies have typically spent about 80% of their IT budgets operating and maintaining what already exists. In FY2025, that was roughly $83 billion of planned federal IT spending.<\/p>\n<p>Private-sector healthcare shows the same pattern in a different shape. A CHIME Leadership Pulse Survey run with RLDatix, released on 19 February 2026, found 76% of healthcare IT leaders said managing too many point solutions makes operations harder rather than easier. Some organizations reported running more than 100 tools across the enterprise. Asked what stops them consolidating, 85% named financial limits.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_Legacy_Systems_Cost_you_Every_Year\"><\/span>What Legacy Systems Cost you Every Year<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Most CFOs see the licence and the support contract. Those are usually the smallest line items.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Cost category<\/b><\/td>\n<td><b>What drives it<\/b><\/td>\n<td><b>Where it usually hides<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Extended vendor support<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Premium contracts for unsupported versions, often priced at a multiple of standard support<\/span><\/td>\n<td><span style=\"font-weight: 400;\">IT operations budget<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Compensating security controls<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Network segmentation, virtual patching, dedicated monitoring for systems that cannot be patched<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Security budget<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Interface maintenance<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Custom point-to-point HL7 v2 feeds that break on every upstream change<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Integration team time<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Manual workarounds<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Staff re-keying data between systems that do not talk to each other<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Clinical and admin labour, rarely measured<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Specialist retention<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Premium salaries or contractor rates for MUMPS, COBOL or IBM i skills<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Recruitment and contractor spend<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Delayed initiatives<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Analytics, patient-facing apps and AI projects that stall because the data cannot be extracted<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Not in any budget line<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Breach exposure<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Higher likelihood and higher cost of a reportable incident<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Cyber insurance premiums and reserves<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>On the last row, the <a href=\"https:\/\/www.ibm.com\/reports\/data-breach\" rel=\"nofollow\">IBM Cost of a Data Breach Report 2026<\/a> puts the average healthcare breach at $6.64 million. That is the highest of any sector, down 10.5% from $7.42 million the year before. The global all-industry average is roughly $5 million, so healthcare remains the most expensive place in the economy to have a security incident.<\/p>\n<p>Scale matters too. HHS Office for Civil Rights breach portal data shows 804 reported breaches of 500 or more records across 2025, affecting around 138.5 million individuals. In 2024 there were 738 breaches affecting roughly 289 million individuals. One incident, at Change Healthcare, accounted for about 192.7 million records of that total.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Where_Legacy_Healthcare_Systems_Fail\"><\/span>Where Legacy Healthcare Systems Fail<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Five failure modes account for most of what goes wrong.<\/p>\n<h3>1. Unpatchable attack surface<\/h3>\n<p>A system running Windows Server 2008 cannot be brought to a current patch level because no current patches exist. The standard response is compensating controls: segment the network, restrict access, monitor harder. That works, and it becomes a permanent line in the security budget.<\/p>\n<h3>2. Interoperability that stops at the department boundary<\/h3>\n<p>Older systems typically expose HL7 v2 messages or a flat-file export and nothing else. Every new connection becomes a bespoke interface. Each interface adds another dependency that can fail.<\/p>\n<h3>3. Clinical workflow friction<\/h3>\n<p>When two systems cannot exchange data, someone types the data twice. That person is usually a nurse or a coder, and the second entry is where transcription errors enter the record. In the Presidio survey, 80% of respondents said outdated technology contributes to burnout.<\/p>\n<h3>4. Compliance drift<\/h3>\n<p>Requirements move. A system frozen at its last supported release cannot move with them, and the gap widens every year.<\/p>\n<h3>5. A shrinking talent pool<\/h3>\n<p>MUMPS, COBOL and RPG developers exist, but fewer each year, and they cost more each year. Documentation for systems of that age is often incomplete, which means the knowledge lives in a small number of heads.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"2026%E2%80%932027_Regulations_shaping_Healthcare_Modernization\"><\/span>2026\u20132027 Regulations shaping Healthcare Modernization<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Three regulatory tracks now set the timetable for modernization decisions that used to be open-ended.<\/p>\n<p><strong>CMS-0057-F.<\/strong> Under the <a href=\"https:\/\/www.cms.gov\/initiatives\/burden-reduction\/overview\/interoperability\/policies-regulations\/cms-interoperability-prior-authorization-final-rule-cms-0057-f\" rel=\"nofollow\">CMS Interoperability and Prior Authorization Final Rule<\/a>, organizations affected by the rule face API requirements that primarily take effect from 1 January 2027. The rule binds impacted payers rather than providers, and the APIs are built on HL7 FHIR. Providers exchanging prior authorization data with those payers inherit the integration work regardless. A legacy system with no FHIR capability turns that into a project with a fixed external date attached.<\/p>\n<p><strong>The proposed HIPAA Security Rule update<\/strong>. HHS published a Notice of Proposed Rulemaking in January 2025 that drew more than 4,000 comments. It would remove the distinction between &#8220;required&#8221; and &#8220;addressable&#8221; safeguards, and mandate technology asset inventories, network mapping, multi-factor authentication and expanded encryption.<\/p>\n<p>It is not final. <a href=\"https:\/\/www.clarkhill.com\/news-events\/news\/hipaa-security-rule-update-delayed-until-2027\/\" rel=\"nofollow\">HHS has moved it to its Long-Term Actions agenda<\/a>, with a July 2027 estimate that is not a binding deadline. Plan against the asset inventory requirement anyway. It is the item legacy environments fail first.<\/p>\n<p><strong>FDA Section 524B.<\/strong> Section 3305 of the Food and Drug Omnibus Reform Act of 2022, enacted 29 December 2022, added Section 524B to the Federal Food, Drug, and Cosmetic Act. It requires cybersecurity documentation, including a software bill of materials and a vulnerability management plan, in premarket submissions for cyber devices. FDA&#8217;s guidance <a href=\"https:\/\/www.federalregister.gov\/documents\/2025\/06\/27\/2025-11669\/cybersecurity-in-medical-devices-quality-system-considerations-and-content-of-premarket-submissions\" rel=\"nofollow\">Cybersecurity in Medical Devices: Quality System Considerations and Content of Premarket Submissions<\/a> was published on 27 June 2025. Devices cleared before 524B are not retroactively covered, which is precisely why so much unsupported embedded software is still in service on hospital floors.<\/p>\n<p>Alongside the rules, the exchange networks have reached a scale that makes non-participation costly. HHS announced on 26 June 2026 that records exchanged through TEFCA had grown from 10 million to more than 1 billion. A system that cannot join that exchange increasingly sits outside the flow of patient information.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Should_you_Maintain_or_Modernize_a_Legacy_System\"><\/span>Should you Maintain or Modernize a Legacy System?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Not every legacy system needs modernizing, and modernizing does not always mean replacing. The test is whether the system is stable and contained, or degrading and connected.<\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Signal<\/b><\/td>\n<td><b>Keep maintaining<\/b><\/td>\n<td><b>Modernize<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Vendor support<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Active contract, patches still shipping<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Ended, or extended support only at a premium<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Network exposure<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Isolated, no inbound connections<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Connected to the EHR, internet or medical devices<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Data demand<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Nobody is asking for this data elsewhere<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Analytics, patient apps or AI initiatives are blocked by it<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Change frequency<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Stable, few change requests a year<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Constant change requests the system cannot absorb<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Regulatory fit<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Meets current obligations<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Cannot meet FHIR, asset inventory or encryption requirements<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Supportability<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Documented, with knowledge held across the team<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Undocumented, or dependent on one person or an external contractor<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Failure impact<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Degraded service in one department<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Care delivery stops<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Key_Considerations_Before_you_Modernize\"><\/span>Key Considerations Before you Modernize<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Five questions decide whether a modernization programme is ready to start.<\/p>\n<p><strong>Do you know what you actually have?<\/strong> Most organizations begin with an incomplete inventory. Departmental databases, interface engines and device-adjacent applications are the ones routinely missed, and they are the ones that surface late and reset the timeline.<\/p>\n<p><strong>Who owns the clinical decisions?<\/strong> Modernization changes how clinicians work. A programme with no named clinical sponsor produces a system that passes testing and fails at go-live.<\/p>\n<p><strong>Where does the data have to end up?<\/strong> Some historical records will migrate into the new system. Some will not, because the new data model cannot accept them. Deciding this at the start changes the architecture; deciding it at the end changes the budget.<\/p>\n<p><strong>What is your downtime tolerance, by system?<\/strong> A scheduling tool can be offline for an afternoon. A clinical results system cannot. That tolerance determines whether you can cut over or must run in parallel, and parallel running is the more expensive option.<\/p>\n<p><strong>Can the organization absorb the change?<\/strong> Training, workflow redesign and support capacity during stabilization are real costs. The CHIME data above puts financial limits ahead of every other barrier, and the costs that get underestimated are usually the non-engineering ones.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Six_Approaches_to_Legacy_System_Modernization\"><\/span>Six Approaches to Legacy System Modernization<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>Approach<\/b><\/td>\n<td><b>What happens<\/b><\/td>\n<td><b>Best fit in healthcare<\/b><\/td>\n<td><b>Main risk<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Rehost<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Move the workload to new infrastructure with no code change<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Systems on hardware nearing end of life where the application still works<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Fixes the hardware problem, none of the software ones<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Replatform<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Move and make targeted changes, such as a database upgrade<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Departmental databases on unsupported database engines<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Scope creeps into a rewrite<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Refactor<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Restructure the code without changing behavior<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Large custom applications with valuable embedded clinical logic<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Needs regression tests that often do not exist<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Rearchitect<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Break the system into services, add APIs<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Monolithic RIS or LIS platforms blocking integration<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Longest timeline, highest coordination cost<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Rebuild<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Write it again on a modern stack<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Small to mid-size systems with well-understood, documented requirements<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Undocumented edge cases resurface at go-live<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Replace<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Buy a commercial product and migrate to it<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Commodity functions such as scheduling, HR and general ledger<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Data migration and process change absorb most of the effort<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A phased pattern usually beats a single cutover for clinical systems. New functionality is built alongside the old system, traffic is routed to it piece by piece, and the legacy component is retired only once nothing calls it. That keeps every step reversible, which matters when the failure mode is a clinician unable to retrieve a chart.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"How_to_Modernize_a_Legacy_Healthcare_System\"><\/span>How to Modernize a Legacy Healthcare System<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3>1. Inventory every system and every interface<\/h3>\n<p>For each one, record a named owner, a documented support status and a data classification. This is the step the proposed HIPAA Security Rule update would make mandatory, and most organizations find in week one that the inventory they hold is incomplete.<\/p>\n<h3>2. Score each system on clinical risk and business value<\/h3>\n<p>Risk covers exposure, supportability and failure impact. Value covers how much other work is blocked by it.<\/p>\n<h3>3. Pick the approach per system<\/h3>\n<p>Use the table above. Resist applying one strategy across the whole estate.<\/p>\n<h3>4. Profile the data before you plan the migration<\/h3>\n<p>Find the free-text fields, the duplicated patient identifiers, and the codes retired a decade ago that are still sitting in active records.<\/p>\n<h3>5. Build the target integration layer first<\/h3>\n<p>A FHIR-capable interface layer gives every subsequent migration somewhere to connect, and removes the temptation to add one more point-to-point feed.<\/p>\n<h3>6. Migrate in waves, with a rollback path per wave<\/h3>\n<p>Run the old and new systems in parallel through at least one full reconciliation cycle before cutting over.<\/p>\n<h3>7. Test the clinical workflow, not the software<\/h3>\n<p>Registration through documentation through order through result through claim. Unit tests will not catch a broken care pathway.<\/p>\n<h3>8. Plan go-live around downtime procedures<\/h3>\n<p>Agree the fallback with clinical leadership before the date, not during the incident.<\/p>\n<h3>9. Decommission properly<\/h3>\n<p>Covered below, because this is where most programmes lose control of the timeline.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Healthcare_Legacy_System_Modernization_Cost\"><\/span>Healthcare Legacy System Modernization Cost<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Modernization cost is driven by the approach and the number of interfaces, not by the size of the organization. A rehost of a stable application is the cheapest route available. A rearchitecture of a monolithic clinical platform is the most expensive, because development is only part of the bill.<\/p>\n<p>For a sense of scale on the replacement end, our own <a href=\"https:\/\/www.sparxitsolutions.com\/blog\/emr-ehr-software-development\/\">EMR\/EHR software development cost analysis<\/a> puts development between $40,000 for a rudimentary EMR system and $250,000 for a progressive one, with implementation costs varying by facility size:<\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Facility type<\/b><\/td>\n<td><b>Initial investment<\/b><\/td>\n<td><b>Annual recurring<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Solo practice (1\u20133 providers)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$15,000 \u2013 $30,000<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$4,700 \u2013 $9,100<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Small hospital (under 100 beds)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$170,000 \u2013 $400,000<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$57,000 \u2013 $99,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Large hospital (500+ beds)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$240,000 \u2013 $510,000<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$80,000 \u2013 $145,000<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Five factors move a quote within those ranges:<\/p>\n<ul>\n<li><strong>Interface count<\/strong>: Every system the application talks to is a separate build, test and cutover.<\/li>\n<li><strong>Data volume and quality<\/strong>: Clean, structured data migrates cheaply. Free-text fields and duplicate identifiers do not.<\/li>\n<li><strong>Compliance scope<\/strong>: HIPAA, HITRUST and device-adjacent work each add validation effort.<\/li>\n<li><strong>Parallel running<\/strong>: Operating two systems through reconciliation is a real line item, and it is the one most often left out.<\/li>\n<li><strong>Archiving and decommissioning<\/strong>: Retiring the old system properly costs money. Skipping it costs more, every year.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Common_Challenges_During_Healthcare_Modernization\"><\/span>Common Challenges During Healthcare Modernization<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3>1. Incomplete discovery<\/h3>\n<p>The GAO finding above is instructive: eight of the 11 most critical federal legacy systems had no complete modernization plan, which GAO linked to a higher likelihood of cost overruns, schedule delays and outright project failure. Healthcare estates carry the same exposure at a departmental level. Budget discovery as a phase with its own deliverable, not as a week of preparation.<\/p>\n<h3>2. Data that will not migrate cleanly<\/h3>\n<p>Historical records accumulate retired codes, free-text entries where structured fields should be, and duplicate patient identifiers created across decades of mergers. Profiling this before design is cheaper than discovering it during migration.<\/p>\n<h3>3. Clinical resistance built on experience<\/h3>\n<p>Staff who have lived through a bad go-live will resist the next one. That resistance is usually well-founded. Involving clinicians in design and testing, rather than in training two weeks before launch, is what changes it.<\/p>\n<h3>4. Shadow workarounds that nobody documented<\/h3>\n<p>Around a quarter of Presidio&#8217;s respondents said they use workarounds for basic tasks. Those workarounds are undocumented processes, and a new system that does not account for them breaks work that was previously getting done.<\/p>\n<h3>5. Budget pressure mid-program<\/h3>\n<p>With 85% of CHIME respondents naming financial limits as the leading barrier to change, multi-year programs face real risk of being paused partway. Sequencing the highest-risk systems first means a pause leaves you safer than you started rather than stranded mid-migration.<\/p>\n<h3>6. Interface regressions<\/h3>\n<p>In a connected estate, changing one system perturbs others. A rollback path per wave is what keeps that recoverable.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"How_to_Build_the_ROI_Case\"><\/span>How to Build the ROI Case<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The business case for modernization rarely wins on technology arguments. It wins when you measure the cost of the current state as carefully as the cost of the project.<\/p>\n<p>Start by establishing a baseline across the seven cost categories in the table above, for the specific systems in scope. Most organizations can produce the first two lines from finance records within a week. The others take longer and are usually where the real value lies.<\/p>\n<p>Then quantify the benefit side in categories a CFO already recognizes:<\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Benefit<\/b><\/td>\n<td><b>How to measure it<\/b><\/td>\n<td><b>Where the number comes from<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Direct cost reduction<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Extended support, compensating controls, and contractor spend removed<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Finance and vendor contracts<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Labour recovered<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Hours spent on manual re-keying and workarounds, costed at loaded rates<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Time study or workflow observation<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Risk reduction<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Change in breach likelihood from removing unpatchable systems<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Security risk register and cyber insurance terms<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Revenue protection<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Claims, prior authorization and billing throughput improvements<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Revenue cycle reporting<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Blocked initiatives released<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Work currently stalled by data being inaccessible<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Project backlog<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Two rules keep the case credible. Measure the baseline before the programme starts, because a benefit you cannot evidence a &#8220;before&#8221; for will be discounted. And review the return after each phase rather than only at the end, so a multi-year programme produces evidence early enough to defend its next tranche of funding.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"How_to_Decommission_a_Legacy_Healthcare_System_and_the_Data_you_can%E2%80%99t_Delete\"><\/span>How to Decommission a Legacy Healthcare System, and the Data you can&#8217;t Delete<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Switching off a legacy healthcare system is not a technical act. It is a records management decision with legal consequences, and it is the step most modernization guides leave out.<\/p>\n<p>Retention requirements can arise from multiple legal, regulatory and organizational sources. The obligation does not end when the system holding the records is retired. Records under legal hold cannot be destroyed at all until the hold lifts. So the old system&#8217;s data has to remain retrievable, in a defensible form, for years after the application itself stops running.<\/p>\n<p>That leaves three routes. Migrate the data into the new system, which is cleanest but rarely possible for everything, because the new system&#8217;s data model will not accept every historical field. Extract it to a read-only clinical archive that staff can query without the original application. Or keep the legacy system running purely as a viewer. That is the most expensive option, and the one organizations drift into by default when nobody plans an alternative.<\/p>\n<p>Decide which route applies to which data set before migration starts, not after. The gap between a planned archive and an indefinitely maintained read-only legacy system compounds every year. It is usually the largest avoidable expense in a modernization programme.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"How_can_SparxIT_Help_you_Modernize_Legacy_Healthcare_Systems\"><\/span>How can SparxIT Help you Modernize Legacy Healthcare Systems?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>We have been building software for 19 years, with 18+ years of healthcare-specific work behind us, 100+ completed healthcare projects and 500+ healthcare IT specialists on the team. Our <a href=\"https:\/\/www.sparxitsolutions.com\/legacy-software-modernization.shtml\">legacy software modernization services<\/a> cover application modernization consulting, software re-engineering, code refactoring, data modernization, API upgradation, cloud modernization and cybersecurity enhancements.<\/p>\n<p>Our modernization projects align with the healthcare privacy, interoperability, medical device and security requirements that apply to your estate, including HIPAA, HITECH, HITRUST CSF, HL7, FHIR, DICOM, GDPR and IEC 62304. Published engagements include a connected patient engagement application that raised user retention by 40%, and a cross-platform telehealth deployment that cut patient wait times by 35%.<\/p>\n<p>Organizations defining their modernization scope can start with <a href=\"https:\/\/www.sparxitsolutions.com\/healthcare\">healthcare IT consulting<\/a> to assess system risks, integration dependencies and modernization priorities. Teams that want modernization delivered as part of a wider platform rebuild can engage our <a href=\"https:\/\/www.sparxitsolutions.com\/end-to-end-software-development-company.shtml\">custom software development<\/a> practice instead.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A legacy system in healthcare is any clinical or administrative application your organization still depends on but can no longer patch, integrate or support properly. It has lost vendor support, cannot exchange data through modern standards, or runs on an operating system that no longer receives security updates. The people using those systems describe the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":15205,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[367],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v17.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Legacy Systems in Healthcare: Costs, Risks &amp; Modernization<\/title>\n<meta name=\"description\" content=\"What legacy systems in healthcare really cost, why they fail, and how to modernize them: approaches, steps, costs, ROI and compliance timelines.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Legacy Systems in Healthcare: Costs, Risks &amp; Modernization\" \/>\n<meta property=\"og:description\" content=\"What legacy systems in healthcare really cost, why they fail, and how to modernize them: approaches, steps, costs, ROI and compliance timelines.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/\" \/>\n<meta property=\"og:site_name\" content=\"Sparx IT Solutions\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-29T12:13:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-29T12:15:28+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2026\/09\/Legacy-systems-in-healthcare.webp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tom Hardy\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/#organization\",\"name\":\"Sparx IT Solutions\",\"url\":\"https:\/\/www.sparxitsolutions.com\/blog\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2016\/01\/sparx_logo.png\",\"contentUrl\":\"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2016\/01\/sparx_logo.png\",\"width\":260,\"height\":260,\"caption\":\"Sparx IT Solutions\"},\"image\":{\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/#website\",\"url\":\"https:\/\/www.sparxitsolutions.com\/blog\/\",\"name\":\"Sparx IT Solutions\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.sparxitsolutions.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2026\/09\/Legacy-systems-in-healthcare.webp\",\"contentUrl\":\"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2026\/09\/Legacy-systems-in-healthcare.webp\",\"width\":1536,\"height\":1024,\"caption\":\"Legacy systems in healthcare\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#webpage\",\"url\":\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/\",\"name\":\"Legacy Systems in Healthcare: Costs, Risks & Modernization\",\"isPartOf\":{\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#primaryimage\"},\"datePublished\":\"2026-09-29T12:13:10+00:00\",\"dateModified\":\"2026-09-29T12:15:28+00:00\",\"description\":\"What legacy systems in healthcare really cost, why they fail, and how to modernize them: approaches, steps, costs, ROI and compliance timelines.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.sparxitsolutions.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Legacy Systems in Healthcare: The Real Cost and How to Modernize\"}]},{\"@type\":\"Article\",\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#webpage\"},\"author\":{\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/#\/schema\/person\/ee5c5fd171d9798adce216205c7e4f2c\"},\"headline\":\"Legacy Systems in Healthcare: The Real Cost and How to Modernize\",\"datePublished\":\"2026-09-29T12:13:10+00:00\",\"dateModified\":\"2026-09-29T12:15:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#webpage\"},\"wordCount\":3245,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2026\/09\/Legacy-systems-in-healthcare.webp\",\"articleSection\":[\"Healthcare\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#respond\"]}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/#\/schema\/person\/ee5c5fd171d9798adce216205c7e4f2c\",\"name\":\"Tom Hardy\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.sparxitsolutions.com\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9f9d93601ddbe78ba05d8c15d74f0d1a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9f9d93601ddbe78ba05d8c15d74f0d1a?s=96&d=mm&r=g\",\"caption\":\"Tom Hardy\"},\"description\":\"Tom Hardy is a senior manager at Sparx IT Solutions, a leading website design and app development company. With a proven track record of success across diverse industries, he excels in overseeing projects and ensuring client satisfaction. In his free time, he explores the latest design trends to incorporate innovative strategies into his work.\",\"sameAs\":[\"Tom Hardy\"],\"url\":\"https:\/\/www.sparxitsolutions.com\/blog\/author\/sparx\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Legacy Systems in Healthcare: Costs, Risks & Modernization","description":"What legacy systems in healthcare really cost, why they fail, and how to modernize them: approaches, steps, costs, ROI and compliance timelines.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/","og_locale":"en_US","og_type":"article","og_title":"Legacy Systems in Healthcare: Costs, Risks & Modernization","og_description":"What legacy systems in healthcare really cost, why they fail, and how to modernize them: approaches, steps, costs, ROI and compliance timelines.","og_url":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/","og_site_name":"Sparx IT Solutions","article_published_time":"2026-09-29T12:13:10+00:00","article_modified_time":"2026-09-29T12:15:28+00:00","twitter_card":"summary","twitter_image":"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2026\/09\/Legacy-systems-in-healthcare.webp","twitter_misc":{"Written by":"Tom Hardy","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Organization","@id":"https:\/\/www.sparxitsolutions.com\/blog\/#organization","name":"Sparx IT Solutions","url":"https:\/\/www.sparxitsolutions.com\/blog\/","sameAs":[],"logo":{"@type":"ImageObject","@id":"https:\/\/www.sparxitsolutions.com\/blog\/#logo","inLanguage":"en-US","url":"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2016\/01\/sparx_logo.png","contentUrl":"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2016\/01\/sparx_logo.png","width":260,"height":260,"caption":"Sparx IT Solutions"},"image":{"@id":"https:\/\/www.sparxitsolutions.com\/blog\/#logo"}},{"@type":"WebSite","@id":"https:\/\/www.sparxitsolutions.com\/blog\/#website","url":"https:\/\/www.sparxitsolutions.com\/blog\/","name":"Sparx IT Solutions","description":"","publisher":{"@id":"https:\/\/www.sparxitsolutions.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.sparxitsolutions.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#primaryimage","inLanguage":"en-US","url":"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2026\/09\/Legacy-systems-in-healthcare.webp","contentUrl":"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2026\/09\/Legacy-systems-in-healthcare.webp","width":1536,"height":1024,"caption":"Legacy systems in healthcare"},{"@type":"WebPage","@id":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#webpage","url":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/","name":"Legacy Systems in Healthcare: Costs, Risks & Modernization","isPartOf":{"@id":"https:\/\/www.sparxitsolutions.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#primaryimage"},"datePublished":"2026-09-29T12:13:10+00:00","dateModified":"2026-09-29T12:15:28+00:00","description":"What legacy systems in healthcare really cost, why they fail, and how to modernize them: approaches, steps, costs, ROI and compliance timelines.","breadcrumb":{"@id":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.sparxitsolutions.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Legacy Systems in Healthcare: The Real Cost and How to Modernize"}]},{"@type":"Article","@id":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#article","isPartOf":{"@id":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#webpage"},"author":{"@id":"https:\/\/www.sparxitsolutions.com\/blog\/#\/schema\/person\/ee5c5fd171d9798adce216205c7e4f2c"},"headline":"Legacy Systems in Healthcare: The Real Cost and How to Modernize","datePublished":"2026-09-29T12:13:10+00:00","dateModified":"2026-09-29T12:15:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#webpage"},"wordCount":3245,"commentCount":0,"publisher":{"@id":"https:\/\/www.sparxitsolutions.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#primaryimage"},"thumbnailUrl":"https:\/\/www.sparxitsolutions.com\/blog\/wp-content\/uploads\/2026\/09\/Legacy-systems-in-healthcare.webp","articleSection":["Healthcare"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.sparxitsolutions.com\/blog\/legacy-systems-in-healthcare\/#respond"]}]},{"@type":"Person","@id":"https:\/\/www.sparxitsolutions.com\/blog\/#\/schema\/person\/ee5c5fd171d9798adce216205c7e4f2c","name":"Tom Hardy","image":{"@type":"ImageObject","@id":"https:\/\/www.sparxitsolutions.com\/blog\/#personlogo","inLanguage":"en-US","url":"https:\/\/secure.gravatar.com\/avatar\/9f9d93601ddbe78ba05d8c15d74f0d1a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9f9d93601ddbe78ba05d8c15d74f0d1a?s=96&d=mm&r=g","caption":"Tom Hardy"},"description":"Tom Hardy is a senior manager at Sparx IT Solutions, a leading website design and app development company. With a proven track record of success across diverse industries, he excels in overseeing projects and ensuring client satisfaction. In his free time, he explores the latest design trends to incorporate innovative strategies into his work.","sameAs":["Tom Hardy"],"url":"https:\/\/www.sparxitsolutions.com\/blog\/author\/sparx\/"}]}},"_links":{"self":[{"href":"https:\/\/www.sparxitsolutions.com\/blog\/wp-json\/wp\/v2\/posts\/15192"}],"collection":[{"href":"https:\/\/www.sparxitsolutions.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sparxitsolutions.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sparxitsolutions.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sparxitsolutions.com\/blog\/wp-json\/wp\/v2\/comments?post=15192"}],"version-history":[{"count":4,"href":"https:\/\/www.sparxitsolutions.com\/blog\/wp-json\/wp\/v2\/posts\/15192\/revisions"}],"predecessor-version":[{"id":15208,"href":"https:\/\/www.sparxitsolutions.com\/blog\/wp-json\/wp\/v2\/posts\/15192\/revisions\/15208"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sparxitsolutions.com\/blog\/wp-json\/wp\/v2\/media\/15205"}],"wp:attachment":[{"href":"https:\/\/www.sparxitsolutions.com\/blog\/wp-json\/wp\/v2\/media?parent=15192"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sparxitsolutions.com\/blog\/wp-json\/wp\/v2\/categories?post=15192"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sparxitsolutions.com\/blog\/wp-json\/wp\/v2\/tags?post=15192"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}